Frequently asked questions
When should snagging start on a project?
As soon as practical completion is in sight, typically as each trade finishes its scope. Starting earlier lets subcontractors put items right before they demobilise, which saves costly return visits later in the job.
How do I avoid snagging disputes?
Attach a photo and a timestamp to every snag, and issue dated PDF reports after each walk. Visual evidence beats memory and cuts disputes sharply, especially on fast-moving multi-trade projects.
Who should attend the snagging walkthrough?
At a minimum the main contractor and the client or their representative; the architect often attends too. Subcontractors usually come along for trade-specific walks after the initial list has been recorded.
How do I close out snags efficiently?
Group items by trade in the report so each subcontractor sees their whole scope. Require a photo when a snag is marked resolved, and re-walk the space before final sign-off to confirm nothing has regressed.
Should I share the snag list with subcontractors?
Yes. A filtered PDF showing only their scope makes it easy for subcontractors to plan return visits and clear items on time, without wading through a list cluttered with other trades' work.