Frequently asked questions
When should the defect list start on a project?
As soon as practical completion is in sight, typically once trades finish their scope. Starting earlier lets subbies clear items before they demobilise, which saves costly return trips later in handover.
How do I avoid defect disputes?
Attach a photo and a timestamp to every item and issue dated PDF reports after each inspection. Photo evidence beats memory and cuts disputes sharply, especially on fast-moving multi-trade projects.
Who should attend the defect inspection?
At a minimum the builder and the owner or their representative, and often the architect too. Subbies usually come for trade-specific walks once the initial list has been recorded.
How do I rectify defects efficiently?
Group items by trade in the report so each subbie sees their whole scope. Require a photo when an item is marked resolved, and re-walk the area before sign-off to confirm nothing has regressed.
Should I share the defect list with subbies?
Yes. A filtered PDF showing only their scope makes it easy for subbies to plan return visits and close items on time, without wading through a list cluttered with other trades' work.