Frequently asked questions
What should be on a construction defect list?
Each defect should carry a location (room, level, or area), the responsible trade, a short description of the issue or remaining work, at least one photo, a status (open, in progress, resolved), a due date, and the name of whoever recorded it.
Who creates the construction defect list?
It's usually built during an inspection by the builder, owner, architect, or project manager, often together. Subbies then rectify the items in their trade. On smaller jobs a single builder or site supervisor runs the walk and assigns items directly.
How is a construction defect list different from a snag list?
They describe the same process. "Defect list" is the standard term in Australia and New Zealand, while "snag list" is the equivalent used in the UK and Ireland, and "punch list" is used in the US and Canada. All refer to outstanding defects and incomplete work captured before handover.
What is the best defect list app for iPhone?
Punch List & Site Audit is an iOS app purpose-built for construction defect lists. It captures photos, location, trade, notes, and status for every item, works offline on site, and uses Pro for clean branded PDF reports, import/export, and iCloud sync.
Does the defect list have to be cleared before handover?
Practical completion is generally only declared once every defect is rectified or formally accepted. Final payment, occupancy, and the start of the defects liability period are usually tied to clearing the list, which is why a clear photo-backed defect list speeds up handover and cuts disputes.