Frequently asked questions
What should be included on a construction snagging list?
Each item should record a location (room, floor, or area), the responsible trade, a short description of the defect or remaining work, at least one photo, a status (open, in progress, resolved), a due date, and the name of the person who logged it.
Who creates the construction snagging list?
It is usually compiled during a walkthrough by the main contractor, client, architect, or project manager, often together. Subcontractors then resolve the items assigned to their trade. On smaller jobs, a single contractor or site manager runs the walk and assigns items directly.
How is a snagging list different from a punch list?
They describe the same process. Snagging list is the standard term in the UK, Ireland, Australia, and New Zealand, while punch list is used in the United States and Canada. Both refer to outstanding defects and unfinished work captured before handover.
What is the best snagging app for iPhone?
Punch List & Site Audit is an iOS app built for construction snagging. It captures photos, location, trade, notes, and status for every item, works offline on site, and uses Pro subscriptions for clean branded PDF reports, import and export, and iCloud sync.
Does the snagging list need to be cleared before handover?
Yes. Practical completion is typically certified only once every snag is resolved or formally accepted. Final payment, occupation, and the start of warranty periods are usually tied to clearing the list, which is why a clear photo-backed report speeds up handover and reduces disputes.